Brief description:

Green Marker Snøhvit

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
0.7 million tonnes
70.6888889 23.6069444



Facts:


Main developer: Statoil

Country: Norway

Project type: Capture Storage

Scale: Large

Status: Operative

Year of operation 2008
Industry: Oil and gas processing


Capture method: Natural Gas Separation

Capture technology: Amine
New or retrofit: New
Transport of CO2 by: none

Storage site:

Brine Reservoirs (2600 m)

Type of storage: Aquifers

Volume: 0.7 million tonnes/CO2

 

Melkøya

A liquefied natural gas (LNG) facility has been built at Melkøya, near Hammerfest in northern Norway. At this Hammerfest LNG plant the gas is liquefied by cooling it down to -163 degrees Celsius. This makes it possible to export the gas by ship to Europe and the USA. The Snøhvit gas contains 5-6% CO2 which freezes to solid matter (so-called Dry ice) at a higher temperature than natural gas. It must therefore be removed before the gas is cooled into LNG. Moreover, the CO2 also has to be separated from the hydrocarbons at a sufficiently early stage in the process, so that the gas mixture does not freeze and block the heat exchangers in the processing plant.

A separate pipeline transports the CO2 from the Hammerfest LNG plant back to the Snøhvit field. There, it is stored in a suitable geological layer of porous sandstone called the Tubåen formation. This structure lies 2,500 metres beneath the seabed and under the layers in Snøhvit containing gas. More than 700,000 tonnes of carbon dioxide will be stored annually in this manner.

A separate monitoring programme has been established to examine how carbon dioxide behaves in the reservoir. This programme is partly financed by the EU.

Statoil is operator for the development and operation of Snøhvit. Gas production started in October 2007 and the first CO2 was injected into the reservoir in April 2008.

Other sources and press releases:

Snohvit Oil Field Production starts (Sep 2007)
Statoil Press release (Jan 2005)
Snohvit Project outline (Sep 2006) [PDF]
Statoil Sleipner and Snohvit presentation [PDF]

Contact info


Main developer: Statoil

Companies involved


News about Snøhvit

Personlige verktøy