NORCEM Cement plant in Brevik, Norway

Brief description:

Red Marker NORCEM Cement plant in Brevik, Norway

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
In total 13.5 mill. NOK/1.7 mil EUR
Financial support:
finsup
--> Volume:
10 000 ton tonnes
59.0554872 9.6980052



Facts:




Country: Norway

Project type: Capture

Scale: Small

Status: Feasibility study

Capital cost: In total 13.5 mill. NOK/1.7 mil EUR

Financal support:
Gassnova


Year of operation Pilot operative by 2018
Industry: Cement


Capture method: Post-combustion

Capture technology: Amine
New or retrofit: Retrofit
Transport of CO2 by: none

Type of storage: Not decided

Volume: 10 000 ton tonnes/CO2


 

Norwegian R&D institutes have together with Norwegian industry started feasibility studies to look at the possibility for CO2 capture integrated with industrial sources. Several candidates have been considered and the most relevant industries can be pulp, refineries, primary aluminum- and cement producers.

Heidelbergs cement’s plant in Brevik, NORCEM
One study is already started in one of the cement manufacturer Heidelbergs two cement factories in Norway (Norcem). The project will examine to which extent excess energy from production of cement can be utilized for capturing of CO2. The study will also establish important knowledge about individual challenges for the cement industry and evaluate how different capture technologies can be fitted to cement plants.

 

Contact information: Per Brevik, Director Alternative Fuels