Bintulu CCS project

Brief description:

Red Marker Bintulu CCS project

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
3 000 000 tonnes
3.19057 113.0901109



Facts:




Country: Malaysia


Scale: Large

Status: Identified

Year of operation 2011
Industry: Oil and gas processing


New or retrofit: Retrofit
Transport of CO2 by: none

Type of storage: Aquifers

Volume: 3 000 000 tonnes/CO2

 

This project is also a CDM proposal, submitted January 2006, and includes capture of CO2 from natural gas (containing 3-6% CO2) from an LNG plant in Bintulu, Malaysia. The project is a join project between Mitsubishi Heavy Industry, JGC and Petronas.

The annual capture is 3 million ton CO2/year and injection though 120 km pipeline into an sub-sea saline aquifer at 1,400 meter depth.

The project is planned to start up in 2011. It should be noted that the proposed methodology is not yet approved by UNFCCC as eligible CDM.